Commercial Power Service

Type of Service

Schedule B-U (Rate 12, 13, 15, 22, 23, 25)

Single-phase and three-phase where available at available voltages.

Applicability

Applicable to commercial consumers, small industrial consumers, governmental entities, public use facilities, non-profit groups, multiphase service for loads under 50 kW, and for energy which is to be resold.
Schedule B-U shall apply to any connection not qualifying for service under Schedule A (Residential) or Schedule LP (Large Power). Service provided under this schedule shall be subject to the established rules and regulations of the Cooperative.
Consumers having their homes on the same premises with their business establishments may include service to both on the same meter, in which case all service will be billed under this schedule, using the rate set out below. A consumer may make provision for two meters, in which case usage for the residential purposes will be billed under the appropriate residential rate and usage for the business purposes will be billed under this schedule and rate.

Explanation of your Bill

Electric Supply Services

Generation

All kWh sold at $0.04471 per kWh (see KWH USAGE in the top portion of your bill)

Fuel Factor (Wholesale Power Cost Adjustment Clause)

Each kilowatt-hour purchased by the Customer from the Cooperative under the Monthly Rate is subject to adjustment in accordance with the Cooperative’s wholesale power cost adjustment provision as filed in its rules and regulations. This cost is averaged over a 3 and 6 month period to minimize drastic fluctuations in your bill.

Electric Distribution Services

Distribution Service is a combination of a minimum fee of
   $17.00 per month* for Single-Phase Service

      OR

   $23.70 per month* for Three-Phase
plus an Energy Delivery Charge based on the list below. 

  • First 250 kWh delivered per month $0.04401 per kWh
  • Next 2,750 kWh delivered per month @ $0.03614 per kWh
  • Over 3,000 kWh delivered per month @ $0.03172 per kWh

*The minimum monthly charge for service under this rate shall be $ 17.00 for single phase and $ 23.70 for three–phase where a 15 kVA or less of transformer capacity is required. For members requiring more than 15 kVA of transformer capacity, the minimum monthly charge shall be increased at the rate of $ 0.55 for each additional kVA or fraction thereof required.

Price-to-Compare

Per kWh = $0.07250